NEW FUEL TANK TK5

High-Voltage Energy Infrastructure Development

THE POWER TO BUILD

High-Voltage Energy Infrastructure Development

The construction of the new 20 kV GIS Substation S0A within the Motor Oil Hellas Refinery at Agioi Theodoroi involved advanced electrical engineering works and interconnections with multiple existing substations. The project required precision coordination within a live refinery environment and strict compliance with industrial safety regulations.
This critical energy infrastructure upgrade strengthened power reliability and operational stability within one of the region’s most significant refining facilities.

Client: MOH
Duration: 16 months
Budget: €5,707,555