MODERNISATION OF IRRIGATION PUMP STATIONS AND CONTROL SYSTEMS

Renewal of Irrigation Pumping Infrastructure and Automation Systems

THE POWER TO BUILD

Renewal of Irrigation Pumping Infrastructure and Automation Systems

Client: ATHENS INTERNATIONAL AIRPORT / AIA
Budget: €545.000,00
Duration:7 Months
Status: In Progress

Upgrade of the existing Sewage Treatment Plant irrigation pumping system, including refurbishment and modification of Pump Stations PS 1/3-01 and PS 1/3-02; demolition and installation of mechanical equipment and piping; architectural, civil and structural works; electrical and cabling works; BAS/automation and IT/SCADA integration; installation of new level switches at the irrigation tanks; sediment removal; testing, commissioning and integration with the existing STP and irrigation systems.