JORDAN - AMMAN AIRPORT
Fuel Systems & Infrastructure Projects
Jordan, Amman Airport
Jordan – Amman Airport
Project 1
Completed: 2012
Project Description:
Fuel farm (80,000 m³) connected to a new receipt pipeline and hydrant refuelling system serving the new terminal.
- Review of the design of the new hydrant refuelling system.
- Assessment of the compliance and operation of the existing aircraft fuel facilities.
Project 2
Completed: 2013
Project Description:
Concession agreement development for the Amman Airport Hydrant System.
- Development of an “Open Access, Transparency and Competitiveness” framework for aircraft refuelling management and operations.
- Evaluation and inspection of the construction, installation, and commissioning of the new hydrant system.
- Preparation of tender elements, business model structure, related parameters, and bidder evaluation criteria for the aviation fuel facilities concession.
Project 3
Completed: 2015
Project Description:
Cleaning and internal inspection of the hydrant system (Pigging).
- Development of the hydrant flushing method statement.
- Testing, trial commissioning, and on-site execution.